Plans & pricing
The prices below are a guide for planning. Your final quote will reflect the delivery location, contract term and configuration.

IP Transit plans
Backbone upstreams · by delivery location
10G Direct
- Dedicated fibre handoff
- Enterprise SLA
- /24 IPv4 or more
- IPv6 ready
- 24×7 NOC
25G Direct
- Higher throughput
- Multi-upstream policies
- Multi-VRF / multi-session
- Optional DDoS add-ons
- 24×7 NOC
100G Direct
- Low-latency routes
- Dual-path design
- Dedicated technical contact
- Service credits option
- Optional DDoS / private lines
Colocation

Hong Kong
Equinix HK2 in Tsuen Wan is the Hong Kong backbone location. Review power, rack space and delivery configuration for Hong Kong and regional connectivity requirements.
Network facility
| POWER | SPACE | TERM | PRICE |
|---|---|---|---|
| 1,000W | 1–12U | 1 mo | $700 |
| 2,000W | 1–25U | 12 mo | $1,200 |
| 4,000W | 1–42U | 12 mo | $2,000 |

Tokyo
The Japan network PoP is at Equinix TY8 in Inzai. Review rack space, power and network handoff arrangements for a deployment in Japan.
Network facility
| POWER | SPACE | TERM | PRICE |
|---|---|---|---|
| 2,000W | 1–25U | 1 mo | $1,400 |
| 4,000W | 1–42U | 12 mo | $2,400 |

Singapore
The Singapore PoP is at Equinix SG1 in Ayer Rajah, a network location for Southeast Asian deployments. Plan the configuration around the required rack space and power.
Network facility
| POWER | SPACE | TERM | PRICE |
|---|---|---|---|
| 1,000W | 1–12U | 1 mo | $650 |
| 2,000W | 1–25U | 12 mo | $1,100 |
| 4,000W | 1–42U | 12 mo | $1,900 |
Landmark illustrations represent the cities, not photographs of the facilities.
DDoS protection plans
On-Demand
- 01Occasional attacks
- 02BGP diversion / GRE return
- 03Incident report
- 04Burst capacity
Always-On
- 01Always scrubbed
- 02Automated policies
- 03Faster convergence
- 04WAF / bot defence
Premium
- 01Multi-site Anycast
- 02Custom scrubbing
- 03Higher priority
- 04Dedicated on-call
Enquiries & delivery
Illustrated work scene · not a staff photoA typical engagement runs 4–6 weeks from first contact to delivery. Urgent scenarios can be accelerated to 2–3 weeks (subject to inventory).
These are the details we work through with you, from the first request through delivery and ongoing operations.

Scoping
Location, BW, SLAConfirm the delivery location, service type, bandwidth and SLA, then review redundancy requirements and your target timeline.

Quoting
Within 1 business dayWork through network paths, port capacity, equipment configuration and costs. If a PoC is needed, discuss its scope at this stage.

Contract
Flexible termsReview the service scope, billing cycle, contract term and SLA. Once agreed, arrange signing and prepare for delivery.

Provisioning
2–3 weeksArrange cross-connects, ports and IP / BGP settings as specified. Check connectivity and coordinate cutover and acceptance.

Operations
24×7 NOCThe NOC monitors traffic and alerts, records and handles incidents, and reviews capacity and configuration changes as usage develops.
Typical delivery timeline4–6 weeks end-to-end